9077 Infrastructure Improvements Phase 2: Stormwater

by Sadie Sanders last modified 2009-06-12 11:36 AM

The second of two phases of improvements to the campus storm water drainage system. Construction will include improvements at approximately 33 locations along campus stream channels and drainages. Phase 2 storm water improvements will address erosion problems within natural drainage channels, and improve the capacity of some sinkholes in the drainage.

3,594,000.00

Planning Study

Kevin Crossley

Planning