Personal tools
You are here: Home Capital Projects Projects Infrastructure Improvements Phase 2: Stormwater
Document Actions

Infrastructure Improvements Phase 2: Stormwater

by Sadie Miles last modified 2008-07-17 08:33 AM

The second of two phases of improvements to the campus storm water drainage system. Construction will include improvements at approximately 33 locations along campus stream channels and drainages. Phase 2 storm water improvements will address erosion problems within natural drainage channels, and improve the capacity of some sinkholes in the drainage.

3,594,000.00

Planning Study

Kevin Crossley

Planning









Infrastructure Improvements Phase 2: Stormwater Planning
Information about planning for this project.

« August 2008 »
Su Mo Tu We Th Fr Sa
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31            
 

Powered by Plone CMS, the Open Source Content Management System

This site conforms to the following standards: