4000-011 Sinsheimer Labs Heating Water Piping Replacement
Install new heating water supply and return lines that supply heating water to Sinsheimer and Thimann Labs. Work area to be from the below grade at existing POC valves in utility tunnel and will tie into existing heating water lines within Sinsheimer Air Handler Room.
|
|
100,000.00 |
|
|
Alteration |
|
|
Ken Filice |
|
|
Construction |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|