1650-002 Cowell College 2008 Summer Major Maintenance Abatement
Abate insulation elbows in two mechanical rooms at Cowell College. Prepare exterior handrails for paint by removing failing lead containing paint. Work includes stairwells, porches and entrance rails. Remove and dispose of entrance glazing panels on all seven Cowell residence halls.
|
|
153,000.00 |
|
|
Alteration |
|
|
James Kuhn |
|
|
Bidding |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|