A Sanitary Sewer Master Plan for the University of California at Santa Cruz (Campus) has not been developed since initial Campus construction in 1964. A master plan is proposed to: assess and document the existing system condition, model existing & future flows, develop a conceptual level Capital Improvement Plan (CIP), including associated costs, to accommodate Campus growth as projected in the 2005 Long Range Development Plan.