Infrastructure Improvements Phase 1 Domestic / Fire Protection Water
Infrastructure 1, domestic and fire water system improvements provides new underground water mains, vaults, pressure reducing stations, double check valves, new main tie-ins and service re-connections. The impairments to water service and fire protection shall follow the specified building release schedule and duration.
|
|
2,000,000.00 |
|
|
Alteration |
|
|
Bruce Hoffman |
|
|
Bidding |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|