Infrastructure Improvements Phase 1 Domestic / Fire Protection Water

by Bruce Hoffman last modified 2008-03-20 03:33 PM

Infrastructure 1, domestic and fire water system improvements provides new underground water mains, vaults, pressure reducing stations, double check valves, new main tie-ins and service re-connections. The impairments to water service and fire protection shall follow the specified building release schedule and duration.

2,000,000.00

Alteration

Bruce Hoffman

Bidding