Campus Infrastructure Improvements, Phase 1: Stormwater

by grazian — last modified 2008-05-23 01:44 PM

The first of two phases of improvements to the campus storm water drainage system. Construction will include improvements at eight locations along campus stream channels and drainages. Phase I will focus on erosion problems at the top of the drainage channels and some repairs in severely eroded areas.

4,500,000.00

Alteration

Trask

Planning